PIP PLE00009

Original price was: $100.00.Current price is: $50.00.

Potholing Guideline

Process Industry Practices , 05/01/2024

Category:
Guaranteed Safe Checkout

The purpose of this guideline is to describe when and why potholing is utilized for construction and design activities, potholing methods, advantages and disadvantages of the methods included, and one-call resources. Potholing may be utilized, as required and described herein, to prevent excavation damage to underground utilities and to avoid unknown foreign utilities.​