The purpose of this guideline is to describe when and why potholing is utilized for construction and design activities, potholing methods, advantages and disadvantages of the methods included, and one-call resources. Potholing may be utilized, as required and described herein, to prevent excavation damage to underground utilities and to avoid unknown foreign utilities.
PIP PLE00009
Original price was: $100.00.$50.00Current price is: $50.00.
Potholing Guideline
Process Industry Practices , 05/01/2024