This volume contains provisions which have been adopted by the Boiler and Pressure Vessel Committee that cover Section III, Divisions 1 and 2, and Section XI to provide, when the need is urgent, rules for materials or constructions not covered by existing Code rules.
Includes all addenda, interpretations, and updates until 2010.